CC - CONSENT ITEM: Approval of the Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554.
On Agenda
10/26/2026
In Control
City Council Meeting Agenda

Attachments (2)

Full Text

title

CC - CONSENT ITEM:  Approval of the Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554.

 

body

Meeting Date:                     October 26, 2026

 

Contact/Dept:                     Matt Huffman/Public Works Department - Engineering

 

Phone Number:                     310-253-5616

 

Fiscal Impact:                     Yes [X]     No [  ]                     General Fund:                     Yes [X]     No [  ]

 

Attachments:                     Yes [X]     No [  ]

 

Public Notification:                     E-Mail: Meetings and Agendas - City Council (10/XX/26);

 

Dept Approval:                     Nick Zornes, Acting Public Works Director  (XX10/XX08/26)

_____________________________________________________________________

 

 

RECOMMENDATION

 

Staff recommends the City Council approve the final plans and specifications and authorize the publication of a notice inviting bids for the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554.

 

 

BACKGROUND

 

Per recommendation and visual observation by Public Works staff and residents, staff have selected portions of streets to be rehabilitated in FY 26-27. The scope of work generally consists of reconstructing existing deteriorated concrete streets in specific locations. The following street locations are proposed for reconstruction.

 

•                     Harter Avenue between Culver Boulevard and Wagner Street

•                     Moore Street at Washington Boulevard

•                     12337 Washington Boulevard

•                     12470 Washington Boulevard

•                     13220 Washington Boulevard Bus Stop

•                     11181 Washington Boulevard (west bound approach lanes at Sepulveda Boulevard)

 

Additionally, the Ocean Drive Sidewalk Project (PS-037) was originally approved by City Council at on the April 13, 2026 meeting and the Council approved both the final plans and specifications and the authorization to publish a notice inviting bids for construction. Staff recommends that this project be included in this bid package and subsequently under one contractor for cost efficiencies associated with larger quantities of concrete.

 

•                     Ocean Drive Sidewalk between Overland Ave and Fairbanks (PS-037);

 

Public Works Department Engineering Division staff prepared specifications, exhibits and bid documents for the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554. Staff recommends the City Council approve the plans and specifications and authorize the advertisement of construction bids for the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554. Construction is scheduled to start Spring 2027.

 

 

FISCAL ANALYSIS

 

Total Estimated Project Costs                     Amount                     

Minor Street Reconstruction PZ-554 (Items 1-6)                     $416,000

Ocean Drive Sidewalk Project PS-037 (Item 7)                     $378,000

25% Construction Contingency                     $198,500                     

TOTAL                     $992,500

 

PZ-554 - Fiscal Year 2026-2027 - Funding Source                     Amount                     

435.CP.80000.000.000.000.730100.PZ554 (Measure M)                     $350,000.00

418.CP.80000.000.000.000.730100.PZ554 (Gas Tax)                     $100,000.00

420.CP.80000.000.000.000.730100.PZ554 (General Fund)                     $279,997.53

Subtotal                     $729,997.53                     

Existing Allocations                     ($200,000.00)                     

TOTAL                     $529,997.53

 

PS-037 - Fiscal Year 2026-2027 - Funding Source                     Amount                     

437.CP.80000.000.000.000.730100.PS037 (Mobility Improvement)                     $275,000.00

420.CP.80000.000.000.000.730100.PS037 (General Fund)                     $205,330.00                     

TOTAL                     $480,330.00

 

For PZ-554, The Adopted Budget for Fiscal Year 2026-2027 includes $279,998 in carryover from General funds, $100,000 in carryover from Special Gas Tax funds, and $350,000 in new allocation from Measure M funds available for PZ-554 (Minor Pavement & Concrete Improvement Project FY26-27).  Existing projects have allocated $200,000 from General funds for Jacobs Street Settlement Repair at McManus for Fiscal Year 2026-2027.

 

For PS-037, The Adopted Budget for Fiscal Year 2026-2027 includes $205,330 in carryover from General funds, and $275,000 in carryover from Mobility Improvement funds available for PS-037 (Ocean Drive Sidewalk Project FY25-26).  A total of $480,330 is available for PS-037 projects for Fiscal Year 2026-2027.  

 

Based on estimated project costs, there is sufficient funding in this project to cover the planned work. 

 

 

ATTACHMENTS

 

•                     2026-09-30-ATT1-Street Reconstruction Project Specifications

•                     2026-09-30-ATT2-PZ-554 Exhibits and PS-037 Plans

 

 

MOTION

 

That the City Council:

 

1.                     Approve the final plans and specifications and authorize the publication of a notice inviting bids for the construction of the Minor Pavement & Concrete Rehabilitation Project (FY26-27) - PZ-554.