Franklin Carvajal

← Back to Legislation
View on CulverCity ↗

Approval of the Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Streetlight Improvement Project, PZ-684 on Washington Place between Zanja Street and Centinela Avenue and Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard

📥
Save a copy for yourself
Click ↓ Download to save this record and its files to your device, so you can read it later or share it with someone else.
File Number
14-194
Type
Minute Order
Status
Passed
Final Action
Approval of the Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Streetlight Improvement Project, PZ-684 on Washington Place between Zanja Street and Centinela Avenue and Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard
On Agenda
4/27/2015
In Control
City Council Meeting Agenda

Attachments (1)

Full Text

title
Approval of the Final Plans and Specifications and Authorization to Publish a Notice Inviting Bids for the Streetlight Improvement Project, PZ-684 on Washington Place between Zanja Street and Centinela Avenue and Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard
 
body
Contact Person/Dept:  Lee Torres/PW
Phone Number:  310-253-5623
 
Fiscal Impact:  Yes [X]    No []                   General Fund:  Yes [X]     No []
 
Public Hearing:  []                Action Item:      []          Attachments: [X]    
 
Commission Action Required:     Yes []     No [X]    Date:           
 
Public Notification:   (E-Mail) Meetings and Agendas - City Council (04/22/15)
 
Department Approval:  Charles D. Herbertson (04/16/15)
____________________________________________________________________________
 
RECOMMENDATION
 
Staff recommends the City Council approve the final plans and specifications and authorize the publication of a Notice Inviting Bids for the Streetlight Improvement Project, PZ-684 along Washington Place between Zanja Street and Centinela Avenue and Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard.
 
BACKGROUND/DISCUSSION
 
The Washington Place and Washington Boulevard Streetlight Improvement Project, PZ-684 will replace and upgrade the existing streetlight system, which has become obsolete and requires replacement for several reasons:
·      It is on series circuit  and is over 30 years old;
·      It has lead wiring which tends to corrode; and,
·      It runs on high voltage.
 
The limits of this project's streetlight improvements are as follows;
·      Washington Place between Zanja Street and Centinela Avenue;
·      Washington Boulevard between Centinela Avenue and Inglewood Boulevard; and,
·      Washington Boulevard between Berryman Avenue and Sepulveda Boulevard
 
The scope of work will consist of replacing conduits, wiring, and removing and replacing existing non-standard streetlight poles with new 28-foot-high anti-graffiti coated concrete streetlight poles to include new fixtures with energy efficient 250 W Induction lamps and replacing fixtures with 400 W metal halide lamps with new fixtures and 250 W Induction lamps on existing 'Cobra-head' streetlights.  
Location
Total Number of New Streetlight Poles to be Installed with Induction Luminaires
Total Number of HPS Luminaires to be Replaced with Induction Luminaires on Existing Streetlight Poles
Washington Place between Zanja Street and Centinela Avenue
25
9
Washington Boulevard between Centinela Avenue and Inglewood Boulevard
3
31
Washington Boulevard between Berryman Avenue and Sepulveda Boulevard
3
41
 
It is expected that the award of the construction contract will occur in June 2015 with construction slated to begin in August 2015 and expected to be completed by December 2015.
 
FISCAL ANALYSIS
 
Estimated Project Expenses
Washington Place Streetlight Improvement Project
$316,000
Washington Blvd - Centinela Ave to Inglewood Blvd
$210,000
Washington Blvd - Berryman Ave to Sepulveda Blvd
$270,000
Total Estimated Project Expenses
$796,000
 
Available Funding
Street Light Upgrades - PZ684 (Fund 418)
$380,333
Street Light Upgrades - PZ684 (Fund 420)
$549,055
Total Available Project Funds
$929,388
ATTACHMENTS
 
Location Maps
 
 
MOTION
 
That the City Council:
 
1.      Approve the plans and specifications for the Streetlight Improvement Project, PZ-684 along Washington Place between Zanja Street and Centinela Avenue, Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard; and,
 
2.      Authorize the publication of a Notice Inviting Bids for the Streetlight Improvement Project, PZ-684 along Washington Place between Zanja Street and Centinela Avenue, Washington Boulevard between Centinela Avenue and Inglewood Boulevard and between Berryman Avenue and Sepulveda Boulevard.