Franklin Carvajal

← Back to Legislation
View on CulverCity ↗

CITY COUNCIL AGENDA ITEM: (1) Approval of Final Plans and Specifications and (2) Authorization of the Publication of a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965.

📥
Save a copy for yourself
Click ↓ Download to save this record and its files to your device, so you can read it later or share it with someone else.
File Number
15-079
Type
Minute Order
Status
Consent Agenda
Final Action
CITY COUNCIL AGENDA ITEM: (1) Approval of Final Plans and Specifications and (2) Authorization of the Publication of a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965.
On Agenda
7/8/2015
In Control
City Council Meeting Agenda

Full Text

title

CITY COUNCIL AGENDA ITEM: (1) Approval of Final Plans and Specifications and (2) Authorization of the Publication of a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965.

 

body

Contact Person/Dept.:  Christopher Evans/PWD

Phone Number:  310-253-5621

 

Fiscal Impact:  Yes [X]    No []                                                                             General Fund:  Yes []     No [X]

 

Public Hearing:  []                               Action Item:                     []                       Attachments:   Yes [X]     No []   

 

Commission Action Required:     Yes []     No [X]    Date:

Commission Name:          

 

Public Notification:   (E-Mail) Meetings and Agendas - City Council (07/08/15)  

 

Department Approval:  Charles D. Herbertson (07/02/15)

______________________________________________________________________

 

 

RECOMMENDATION:

 

Staff recommends the City Council:  (1) approve the final plans and specifications and (2) authorize the publication of a Notice Inviting Bids for the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965.

 

 

BACKGROUND:

 

The existing lane line striping and pavement markings on Washington Boulevard west of Sepulveda Boulevard to the westerly City boundary of Walnut Avenue/Del Rey Avenue are faded and need to be repainted. The proposed repainting plan adheres to the City’s Bicycle and Pedestrian Master Plan (BPMP) by creating 5’ wide eastbound and westbound bicycle lanes along approximately 86% of the segment and where narrow, installation of share the road “sharrows” along the remaining 14% (Project).,  

 

The BPMP was adopted by Resolution of the City Council on November 8, 2010 (see Attachment 1). The BPMP provides a guide for the development of bicycle and pedestrian facilities in Culver City with the goal of encouraging walking and biking, thereby promoting health, reducing traffic congestion, creating a thriving, walkable business environment, and improving quality of life in Culver City. The BPMP was developed with input from the community that included five public workshops and extensive participation from a City Council appointed Public Advisory Committee.

 

DISCUSSION:

 

The proposed Project includes removal of the existing lane lines and markings, spotting new lane lines to accommodate creation of the bike lanes and sharrows and restriping the roadway.  The Project will utilize a lane line enhancement technique of highlighting the white lane line markings with a black paint frame. This technique was successful when previously used along Sepulveda Boulevard from Jefferson Boulevard to Green Valley Circle as it enhances lane line visibility on concrete surfaces.

 

Proposed Bike Lanes/Sharrows

 

The BPMP categorizes Washington Boulevard as a primary bikeway corridor in need of bike facility improvements and, if authorized by the City Council, the Project will add approximately 2.45 miles of bike lanes and sharrows as follows:

 

 

Street

Limit 1

Limit 2

Type

Length (Miles)

Washington Bl

Walnut Ave/ Del Rey Ave

Walgrove Ave

Sharrow

.26

Washington Bl

Walgrove Ave

Lyceum Ave

Bike Lane

.3

Washington Bl

Lyceum Ave

Wade St

Sharrow

.3

Washington Bl

Wade St

Chase Ave

Bike Lane

.25

Washington Bl

Chase Ave

Centinela Ave

Sharrow

.09

Washington Bl

Centinela Ave

Sepulveda Bl

Bike Lane

1.25

Total Mileage

2.45

 

 

Area Improvement Plans:

 

The Project striping plan anticipates the existing and future installation of several landscaped medians along West Washington Boulevard as part of the City’s Area Improvement Plans (AlP).

 

Staff from the Public Works and Community Development Departments met with the Culver City Chamber of Commerce to review the Project and AIP plans and demonstrated that the striping plan will accommodate both bike lane and median installation without resulting in a reduction in curbside parking spaces.

 

 

FISCAL ANALYSIS:

 

The City Council on-call engineering consultant, Willdan Engineering, prepared the Project plans and specifications at a cost of $33,365.

 

Sufficient Gas Tax Funds are available to construct the Project. The Engineer’s estimate to construct the project is $347,000.

 

 

ATTACHMENTS:

 

1. November 8, 2010 City Council Bicycle and Pedestrian Master Plan Resolution.

2. Project Location Map

 

The Plans and Specifications for the Project are available for review from the following link: <http://www.culvercity.org/Government/PublicWorks/CouncilItems.aspx>

 

 

MOTION:

 

That the City Council:

 

1.                     Approve the final plans and specifications for the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965; and,

 

2.                     Authorize the publication of a notice inviting bids for construction of the Washington Boulevard Striping and Bike Lane Project, CIP No. PZ-965.

 

 

 

NOTES: